Data catalogue
Browse every dataset available through DataHub. Each entry is a Snowflake view backed by a stream of records updated at the cadence shown. Filter by source, search by name, or export the full index.
Access methods
View on arcobi.com →Per-stream pulls with full metadata and watermarks for incremental sync. Query specific streams on demand.
Live, read-only access to the curated DataHub catalogue through a Snowflake secure data share. Supports Streamlit apps built directly via the Snowflake ecosystem.
Scheduled delivery of the curated DataHub views into your preferred cloud destination.
A web interface that visualizes prices, generation, demand, and outages across major North American markets. Opens in a browser, no setup.
Direct download of historical and real-time market data into Excel. Available as ad-hoc pulls or recurring extracts.
Datasets
587 of 587 views
| Source | View name | Description | Cadence | Stream types | Streams |
|---|---|---|---|---|---|
| OTHER | AEMO_DEM | AEMO Demand | 5m | 1 | 4 |
| OTHER | AEMO_PRC | AEMO Price | 5m | 1 | 4 |
| AESO | AESO_12H_SW_FCST | AESO 12 Hour Solar and Wind Forecast | 1h | 6 | 6 |
| AESO | AESO_1MIN_CSD | AESO 1 minute Current Supply Demand | 1m | 2 | 25 |
| AESO | AESO_24M_SPLY_DEM_FCST | AESO 24 Month Supply and Demand Forecast | daily | 1 | 1 |
| AESO | AESO_7D_30D_ROLLING | AESO 7 and 30 Day Rolling Min-Max-Avg Prices | 1h | 6 | 6 |
| AESO | AESO_7D_ACAP | AESO 7 Days Hourly Available Capability MW | 1h, daily | 3 | 22 |
| AESO | AESO_7D_ACAP_FACTOR | AESO 7 Days Hourly Available Capability | daily | 1 | 13 |
| AESO | AESO_7D_FCST_OP_RSV | AESO 7 Day Forecast of Operating Reserves Volumes | 1h | 2 | 6 |
| AESO | AESO_7D_SW_FCST | AESO 7 Day Solar and Wind Forecast | 1h | 6 | 6 |
| AESO | AESO_ACTIVE_OP_RSV_PRC | AESO Active Operating Reserve Price | daily | 1 | 8 |
| AESO | AESO_APPR_OUT | AESO Approved Outages | 15m | 1 | 1 |
| AESO | AESO_ATC_IC | AESO ATC and Intertie Capability | 1h | 8 | 66 |
| AESO | AESO_CSD | AESO Current Supply Demand | 1m, 5m, 1h | 5 | 531 |
| AESO | AESO_DDS | AESO DDS Market | 1m | 1 | 1 |
| AESO | AESO_ENGY_MO_SNAP | AESO Energy Merit Order Snapshot | 1h | 1 | 1 |
| AESO | AESO_HRLY_FCST_PRC | AESO Hourly and Forecast Pool Price | 1h | 2 | 2 |
| AESO | AESO_LOAD_FCST_DEM | AESO Internal Load and Forecast Demand | 1h | 2 | 2 |
| AESO | AESO_LOAD_GEN_OUT | AESO Load and Gen Outage | daily, weekly | 6 | 52 |
| AESO | AESO_LT_OUT | AESO Long-Term Outages | 15m | 1 | 1 |
| AESO | AESO_METERED_VOLM | AESO Metered Volumes | 1h | 9 | 462 |
| AESO | AESO_METERED_VOLM_RAW | AESO Metered Volumes Raw | 1h | 1 | 0 |
| AESO | AESO_MO_PRC_SET | AESO Merit Order Price Setter | 1h | 1 | 1 |
| AESO | AESO_MSG | AIES Event Log | 5m | 1 | 1 |
| AESO | AESO_PEAK_LOAD_FCST | AESO Peak Load Forecast | 1h | 1 | 1 |
| AESO | AESO_PRC | AESO Price | 1m, 5m | 2 | 2 |
| AESO | AESO_PRC_VOLM | AESO Price and Volume | 1m | 1 | 2 |
| AESO | AESO_RES_MARGIN | AESO Reserve Margin | 1h | 1 | 1 |
| AESO | AESO_STBY_OP_RSV_PRC | AESO Standby Operating Reserve Price | daily | 1 | 6 |
| HYDROLOGY | BC_SWE | British Columbia Snow Water Equivalent | 1h | 1 | 89 |
| HYDROLOGY | BCH_HYDROMET | BC Hydro, Hydrometeorologic Data | 1h | 1 | 59 |
| HYDROLOGY | BCH_LOAD | BC Hydro Hourly Control Area Load | 1h | 1 | 1 |
| HYDROLOGY | BCH_NET_FLOW | BC Hydro Net Actual Flow | 5m | 1 | 2 |
| HYDROLOGY | BCH_PL_OUT | BC Hydro Planned Transmission Outages | 1h | 1 | 1 |
| OTHER | BOC_EXCHG_RATE | Bank Of Canada Daily Exchange Rates | daily | 23 | 23 |
| BPA | BPA_FLOWGATE | BPA Flowgate Loadings | 15m | 1 | 18 |
| BPA | BPA_GEN | BPA Balancing Authority Generation | 5m | 6 | 7 |
| BPA | BPA_INTERTIE | BPA Interties | 15m, 1h | 3 | 11 |
| BPA | BPA_INTI | BPA Interties and Flowgates | 1h | 12 | 12 |
| BPA | BPA_LOAD | BPA Balancing Authority Load | 5m, 1h | 3 | 3 |
| BPA | BPA_PATH_LIMIT | BPA Hourly TTC Path Limits | 1h | 1 | 35 |
| BPA | BPA_TRANS | BPA BC Net Transmission | 5m | 1 | 2 |
| HYDROLOGY | CA_DWR | California Dept Of Water and Resources | daily | 1 | 8 |
| HYDROLOGY | CA_DWR_BASIN | California DWR Basin Summary of Full Natural Flows | weekly | 1 | 37 |
| HYDROLOGY | CA_DWR_WSF | California DWR B-120 Water Supply Forecast Summary | weekly | 4 | 64 |
| CAISO | CAISO_ACT_OP_RSV | CAISO Actual Operating Reserves | 5m | 1 | 1 |
| CAISO | CAISO_AGG_GEN_OUT | CAISO Aggregate Generation Outages | 1h | 5 | 8 |
| CAISO | CAISO_AS_REQ | CAISO AS Requirements | 1h | 18 | 95 |
| CAISO | CAISO_CON_BID_AWARD_DEM | CAISO Convergence Bidding Aggregate Demand Awards | 1h | 1 | 1 |
| CAISO | CAISO_CON_BID_AWARD_SPLY | CAISO Convergence Bidding Aggregate Supply Awards | 1h | 1 | 1 |
| CAISO | CAISO_CRR_A_AR | CAISO Annual Auction Results | daily | 1 | 0 |
| CAISO | CAISO_CRR_A_CLRG_PRC | CAISO CRR Monthly Clearing Prices | daily | 1 | 0 |
| CAISO | CAISO_CRR_M_AR | CAISO Monthly Auction Results | daily | 1 | 0 |
| CAISO | CAISO_CRR_M_CLRG_PRC | CAISO CRR Annual Clearing Prices | daily | 1 | 0 |
| CAISO | CAISO_DAILY_RNEW | CAISO Daily Renewables Watch | daily | 14 | 14 |
| CAISO | CAISO_DAM_ADQ | CAISO DAM Resource Adequacy and Minimum Load | 1h | 6 | 6 |
| CAISO | CAISO_DAM_ADQ_PRC | CAISO DAM Resource Adequacy and Minimum Load Costs | 1h | 4 | 4 |
| CAISO | CAISO_DAM_AS_CLRG_PRC | CAISO DAM AS Clearing Prices | 1h | 6 | 26 |
| CAISO | CAISO_DAM_LMP | CAISO DAM Locational Marginal Prices | 1h | 2 | 23,050 |
| CAISO | CAISO_DAM_SMRY_DEM | CAISO DAM Summary Demand | daily | 8 | 8 |
| CAISO | CAISO_DAM_SMRY_PRC | CAISO DAM Summary Price | daily | 28 | 28 |
| CAISO | CAISO_DAM_SMRY_SPLY | CAISO DAM Summary Supply | daily | 24 | 24 |
| CAISO | CAISO_DAM_SYS_LOAD_RES_SCH | CAISO DAM System Load and Resource Schedules | 1h | 1 | 20 |
| CAISO | CAISO_DAM_TIU | CAISO DAM Transmission Interface Usage | 1h | 26 | 2,236 |
| CAISO | CAISO_DAM_WS_FCST | CAISO DAM Wind and Solar Forecast | 1h | 2 | 6 |
| CAISO | CAISO_DEM_FCST | CAISO Demand Forecast | 5m, 15m, 1h | 6 | 153 |
| CAISO | CAISO_EIM_TSFR_LIMIT | CAISO EIM Transfer Limits By Tie | 1h | 4 | 432 |
| CAISO | CAISO_EIM_TSFR_TIE | CAISO EIM Transfer By Tie | 1h | 4 | 428 |
| CAISO | CAISO_EXPT_ENGY | CAISO Expected Energy | 5m | 16 | 16 |
| CAISO | CAISO_FLEX_RAMP_REQ | CAISO Flexible Ramp Requirements | 5m, 15m | 4 | 44 |
| CAISO | CAISO_FUEL_PRCS | CAISO Fuel Prices | 1h | 2 | 189 |
| CAISO | CAISO_GGG_PRC | CAISO Greenhouse Gas Allowance Price | daily | 1 | 1 |
| CAISO | CAISO_HASP_LMP | CAISO HASP Locational Marginal Prices | 15m | 2 | 20,453 |
| CAISO | CAISO_HASP_SYS_LOAD_RES_SCH | CAISO HASP System Load and Resource Schedules | 1h | 1 | 38 |
| CAISO | CAISO_HASP_TIU | CAISO HASP Transmission Interface Usage | 15m | 26 | 2,214 |
| CAISO | CAISO_HASP_WS_FCST | CAISO HASP Wind and Solar Forecast | 1h | 2 | 5 |
| CAISO | CAISO_INTI_CNST_SHD_PRC | CAISO Intertie Constraint Shadow Prices | 5m, 1h | 6 | 36 |
| CAISO | CAISO_KEY_STATS | CAISO Key Statistics | 5m | 1 | 1 |
| CAISO | CAISO_MARG_LOSS | CAISO DAM and HASP Marginal Losses | 1h | 2 | 2 |
| CAISO | CAISO_MARG_LOSS_COST | CAISO DAM and HASP Marginal Losses Cost | 1h | 2 | 2 |
| CAISO | CAISO_MCA_GENCAP | CAISO Master Control Area Generating Capability | daily | 12 | 34 |
| CAISO | CAISO_MPM_DAM_LMP | CAISO MPM DA Locational Marginal Prices | 1h | 1 | 2,805 |
| CAISO | CAISO_NET_CLRD_CONV_BID_AWARD | CAISO Net Cleared Convergence Bidding Awards | 1h | 1 | 259 |
| CAISO | CAISO_NOM_SHD_PRC | CAISO Nomogram/Branch Shadow Prices | 15m, 1h | 3 | 3 |
| CAISO | CAISO_NON_OP_GEN_AGG | CAISO Curtailed and non-operational generators aggregate | daily | 1 | 9 |
| CAISO | CAISO_NON_OP_GEN_DET | CAISO Curtailed and non-operational generators details | daily | 1 | 9 |
| CAISO | CAISO_OTLK_ADQ | CAISO Todays Outlook, Resource Adequacy Trend | 5m | 10 | 10 |
| CAISO | CAISO_OTLK_ADQ_AGG | CAISO Todays Outlook, Resource Adequacy Trend Aggregate | 5m | 5 | 5 |
| CAISO | CAISO_OTLK_DEM | CAISO Todays Outlook, Demand | 5m, 1h | 5 | 5 |
| CAISO | CAISO_OTLK_EMIS | CAISO Todays Outlook, Emissions | 10m | 2 | 2 |
| CAISO | CAISO_OTLK_HYBRID | CAISO Todays Outlook, Hybrid Trends | 5m | 6 | 6 |
| CAISO | CAISO_OTLK_RNEW | CAISO Todays Outlook, Renewables | 5m | 6 | 6 |
| CAISO | CAISO_OTLK_SPLY | CAISO Todays Outlook, Supply | 5m | 7 | 7 |
| CAISO | CAISO_PEAK_DEM_FCST | CAISO Peak Demand Forecast | daily | 1 | 27 |
| CAISO | CAISO_RTD_EIM_GHG_SHD_PRC | CAISO RTD EIM GHG Shadow Prices | 5m | 1 | 1 |
| CAISO | CAISO_RTD_EIM_TFSR_LIMITS | CAISO RTD EIM Transfer Limits | 1h | 1 | 20 |
| CAISO | CAISO_RTD_FLEX_RAMP_AGGR_AWARD | CAISO RTD Flex Ramp Aggregated Awards | 5m | 2 | 32 |
| CAISO | CAISO_RTD_FLEX_RAMP_CNST | CAISO RTD Flexible Ramping Constraint Results | 5m | 2 | 33 |
| CAISO | CAISO_RTD_FLEX_RAMP_SHD_PRC | CAISO RTD Flexible Ramping Shadow Price | 5m | 1 | 32 |
| CAISO | CAISO_RTD_WS_FCST | CAISO RTD Wind and Solar Forecast | 5m | 2 | 5 |
| CAISO | CAISO_RTM_ADQ | CAISO RTM Resource Adequacy and Minimum Load | 1h | 6 | 6 |
| CAISO | CAISO_RTM_ADQ_PRC | CAISO RTM Resource Adequacy and Minimum Load Costs | 1h | 4 | 4 |
| CAISO | CAISO_RTM_AS_CLRG_PRC | CAISO RTM Interval AS Clearing Prices | 15m | 6 | 31 |
| CAISO | CAISO_RTM_HRLY_LAP | CAISO RTM Hourly LAP Prices | 1h | 1 | 80 |
| CAISO | CAISO_RTM_INTI_CNST_SHD_PRC | CAISO Interval Intertie Constraint Shadow Prices | 5m | 2 | 2 |
| CAISO | CAISO_RTM_LMP | CAISO RTM Interval Locational Marginal Prices | 5m | 2 | 20,349 |
| CAISO | CAISO_RTM_NOM_SHD_PRC | CAISO Interval Nomogram/Branch Shadow Prices | 5m | 1 | 1 |
| CAISO | CAISO_RTM_SYS_LOAD_RES_SCH | CAISO RTM System Load and Resource Schedules | 5m | 1 | 63 |
| CAISO | CAISO_RTPD_EIM_GHG_SHD_PRC | CAISO RTPD EIM GHG Shadow Prices | 5m | 1 | 1 |
| CAISO | CAISO_RTPD_EIM_TFSR_LIMITS | CAISO RTPD EIM Transfer Limits | 1h | 1 | 20 |
| CAISO | CAISO_RTPD_FLEX_RAMP_AGG_AWARD | CAISO RTPD Flex Ramp Aggregated Awards | 15m | 2 | 32 |
| CAISO | CAISO_RTPD_FLEX_RAMP_CNST | CAISO RTPD Flexible Ramping Constraint Results | 15m | 2 | 37 |
| CAISO | CAISO_RTPD_FLEX_RAMP_SHD_PRC | CAISO RTPD Flexible Ramping Shadow Price | 15m | 2 | 41 |
| CAISO | CAISO_RTPD_LMP | CAISO RTPD Locational Marginal Prices | 15m | 1 | 20,215 |
| CAISO | CAISO_RTPD_WS_FCST | CAISO RTPD Wind and Solar Forecast | 15m | 2 | 5 |
| CAISO | CAISO_RUC_ADQ | CAISO RUC Resource Adequacy and Minimum Load | 1h | 6 | 6 |
| CAISO | CAISO_RUC_ADQ_PRC | CAISO RUC Resource Adequacy and Minimum Load Costs | 1h | 4 | 4 |
| CAISO | CAISO_RUC_PRC | CAISO RUC Price | 1h | 1 | 496 |
| CAISO | CAISO_RUC_SYS_LOAD_RES_SCH | CAISO RUC System Load and Resource Schedules | 1h | 1 | 10 |
| CAISO | CAISO_SPLY | CAISO 5 Min Supply | 5m | 3 | 3 |
| CAISO | CAISO_SPREADS | CAISO Spreads | 1h | 2 | 709 |
| CAISO | CAISO_SYS_MSG | CAISO System Operating Messages | 1h | 1 | 1 |
| CAISO | CAISO_TRANS_OUT | CAISO Transmission Outages | 1h | 4 | 13 |
| CAISO | CAISO_TRANS_OUT_IMP_EXP | CAISO Import Export Transmission Outages | 1h | 2 | 176 |
| CAISO | CAISO_WS_CURT | CAISO Wind and Solar Curtailment | 1h, daily | 10 | 16 |
| CAISO | CAISO_WS_FCST | CAISO Wind and Solar Forecast | 5m, 15m, 1h | 4 | 18 |
| CAISO | CAISO_WS_MRKT_WATCH | CAISO Wind and Solar Daily Market Watch | 1h | 5 | 5 |
| HYDROLOGY | CAL_HYDRO_DAILY_USGS | California Hydro Daily USGS | daily | 1 | 3 |
| HYDROLOGY | CAL_HYDRO_DWR | California DWR Hydro | 15m | 1 | 11 |
| HYDROLOGY | CAL_HYDRO_RT_USGS | California Hydro Real Time USGS | 15m | 1 | 3 |
| HYDROLOGY | CAL_HYDRO_SCE | California Hydro, Southern California Edison | 15m | 1 | 1 |
| EXCHANGES | CME_FUTURES | CME Group Futures, Daily Settlements | daily | 1 | 166 |
| EXCHANGES | CME_OPTIONS | CME Group Call and Put Options | daily | 2 | 92 |
| EXCHANGES | CME_SETTLES | CME Group Daily Settlements | daily | 1 | 123 |
| HYDROLOGY | COL_RIV_ELEVATION | Columbia River DART Elevation 10 Year Average | daily | 1 | 18 |
| HYDROLOGY | COL_RIV_OUTFLOW | Columbia River DART Outflow 10 Year Average | daily | 1 | 18 |
| WEATHER | EC_24HR_FCST | Environment Canada Hourly Forecast | 1h | 1 | 37 |
| WEATHER | EC_DAILY_ACTUAL | Environment Canada Daily Data | daily | 1 | 36 |
| WEATHER | EC_HRLY_ACTUAL | Environment Canada Current Conditions | 1h | 1 | 37 |
| EIA | EIA_AVG_NG_PRC | EIA Selected National Average Natural Gas Prices | weekly | 7 | 7 |
| EIA | EIA_CRUDE | EIA Crude Oil Production | weekly | 1 | 41 |
| EIA | EIA_DEM | EIA Balancing Authority Demand | 1h | 1 | 65 |
| EIA | EIA_DIESEL_COAL_PRC | EIA Diesel and Coal Price | daily, weekly | 2 | 6 |
| EIA | EIA_GEN_FUEL_CONSUM | EIA Monthly Generation and Fuel Consumption Time Series | weekly | 1 | 10,194 |
| EIA | EIA_GEN_TYPE | EIA Balancing Authority Generation by Energy Source | 1h | 19 | 422 |
| EIA | EIA_M_AVG_NG_PRC | EIA Monthly Average Price of Natural Gas, by State | weekly | 1 | 52 |
| EIA | EIA_MN_CONSUM | EIA Natural Gas Consumption | weekly | 1 | 1 |
| EIA | EIA_NET_GEN | EIA Balancing Authority Generation by Energy Source | 1h | 1 | 74 |
| EIA | EIA_NET_INT | EIA Balancing Authority Net Interchange | 1h | 1 | 415 |
| EIA | EIA_NG_CAP | EIA Natural Gas Underground Storage Capacity Summary | weekly | 1 | 36 |
| EIA | EIA_NG_DLVRY | EIA Natural Gas Deliveries to All Consumers, by State | weekly | 1 | 52 |
| EIA | EIA_NG_PROD | EIA Marketed Production of Natural Gas, by State | weekly | 1 | 36 |
| EIA | EIA_NG_PWR_PRC | EIA Natgas and Power Price | weekly | 2 | 20 |
| EIA | EIA_NG_STORAGE | EIA Underground Natural Gas Storage, All Operators | weekly | 8 | 43 |
| EIA | EIA_NG_WD | EIA Net Withdrawals from Underground | weekly | 1 | 36 |
| EIA | EIA_US_NG_IMP_EXP | U.S. Natural Gas Exports, by Country | weekly | 6 | 76 |
| EIA | EIA_WKLY_STORAGE | EIA Weekly Natural Gas Storage Report | weekly | 3 | 21 |
| OTHER | ENMAX_DEM | Enmax Real-Time System Demand | 1m | 1 | 1 |
| OTHER | EPA_AGG_GEN_STATS | EPA Aggregated Hourly Stats by Region | 1h | 5 | 10 |
| OTHER | EPA_GEN_STATS | EPA Emissions Hourly Stats | 1h | 1 | 4,247 |
| ERCOT | ERCOT_2D_AS_AGG_OFFER | ERCOT 2 Day Ancillary Services Agg Offers | 1h | 1 | 9 |
| ERCOT | ERCOT_2D_AS_DAM_CLRD_QTY | ERCOT 2 Day Ancillary Services DAM Cleared Quantity | 1h | 1 | 8 |
| ERCOT | ERCOT_2D_AS_SA_QTY | ERCOT 2 Day Ancillary Services Self Arranged Quantity | 1h | 1 | 9 |
| ERCOT | ERCOT_2D_DAM_SCED_EC | ERCOT 2-Day DAM and SCED Energy Curves | 5m, 1h | 7 | 0 |
| ERCOT | ERCOT_2D_RT_GEN | ERCOT 2-Day Real Time Gen | 15m | 14 | 66 |
| ERCOT | ERCOT_2D_RT_LOAD | ERCOT 2-Day Real Time Load | 15m | 4 | 16 |
| ERCOT | ERCOT_3D_HP_AS_OFFER | ERCOT 3-Day Highest Price AS Offer Selected | 1h | 1 | 5 |
| ERCOT | ERCOT_3D_HPBID_DISP | ERCOT 3-Day Highest Price Bids Selected or Dispatched in SCED | 5m | 1 | 1 |
| ERCOT | ERCOT_60D_COP_APSNAP | ERCOT 60-Day COP Adjustment Period Snapshot | 1h | 1 | 1 |
| ERCOT | ERCOT_60D_DAM_EB | ERCOT 60 Day Disclosure DAM Energy Bids | 1h | 1 | 1 |
| ERCOT | ERCOT_60D_DAM_EBA | ERCOT 60 Day Disclosure DAM Energy Bid Awards | 1h | 1 | 1 |
| ERCOT | ERCOT_60D_DAM_EO_OA | ERCOT 60 Day Disclosure DAM Energy Only Offer Awards | 1h | 1 | 1 |
| ERCOT | ERCOT_60D_DAM_EOO | ERCOT 60 Day Disclosure DAM Energy Only Offers | 1h | 1 | 1 |
| ERCOT | ERCOT_60D_DAM_GEN_RES | ERCOT 60 Day Disclosure DAM Generation Resource | 1h | 1 | 1 |
| ERCOT | ERCOT_60D_DAM_GEN_RES_ASO | ERCOT 60 Day Disclosure DAM Generation Resource AS Offers | 1h | 1 | 1 |
| ERCOT | ERCOT_60D_DAM_GEN_RES_ASO_RD | ERCOT 60 Day Disclosure DAM Generation Resource AS Offers REGDown | 1h | 1 | 1 |
| ERCOT | ERCOT_60D_DAM_LOAD_RES | ERCOT 60 Day Disclosure DAM Load Resource | 1h | 1 | 1 |
| ERCOT | ERCOT_60D_DAM_LOAD_RES_ASO | ERCOT 60 Day Disclosure DAM Load Resource AS Offers | 1h | 1 | 1 |
| ERCOT | ERCOT_60D_DAM_PTP_OB | ERCOT 60 Day Disclosure DAM PTP Obligation Bids | 1h | 1 | 1 |
| ERCOT | ERCOT_60D_DAM_PTP_OBA | ERCOT 60 Day Disclosure DAM PTP Obligation Bid Awards | 1h | 1 | 1 |
| ERCOT | ERCOT_60D_DAM_PTP_OO | ERCOT 60 Day Disclosure DAM PTP Obligation Option | 1h | 1 | 1 |
| ERCOT | ERCOT_60D_DAM_PTP_OOA | ERCOT 60 Day Disclosure DAM PTP Obligation Option Awards | 1h | 1 | 1 |
| ERCOT | ERCOT_60D_DAM_QSE_SA_AS | ERCOT 60 Day Disclosure DAM QSE Self Arranged AS | 1h | 1 | 1 |
| ERCOT | ERCOT_60D_SCED_DSR_LOAD | ERCOT 60 Day Disclosure SCED DSR Load | 15m | 1 | 1 |
| ERCOT | ERCOT_60D_SCED_GEN_RES | ERCOT 60 Day Disclosure SCED Generation Resource | 15m | 1 | 1 |
| ERCOT | ERCOT_60D_SCED_LOAD_RES | ERCOT 60 Day Disclosure SCED Load Resource | 15m | 1 | 1 |
| ERCOT | ERCOT_60D_SCED_QSE_SA_AS | ERCOT 60 Day Disclosure SCED QSE Self Arranged AS | 15m | 1 | 1 |
| ERCOT | ERCOT_60D_SCED_SMNE_GEN_RES | ERCOT 60 Day Disclosure SCED SMNE Gen Resource | 15m | 1 | 1 |
| ERCOT | ERCOT_7D_LOAD_FCST | ERCOT Seven-Day Load Forecast | 1h | 6 | 34 |
| ERCOT | ERCOT_ACT_LOAD | ERCOT Actual Loads | 1h | 2 | 22 |
| ERCOT | ERCOT_ACT_TLF | ERCOT Actual Transmission Loss Factors | 15m | 1 | 1 |
| ERCOT | ERCOT_ACT_WPP | ERCOT Actual Wind Power Production | 1m, 5m | 2 | 2 |
| ERCOT | ERCOT_AGG_AS_OC | ERCOT Aggregated Ancillary Service Offer Curve | 1h | 1 | 10 |
| ERCOT | ERCOT_AGG_WSO | ERCOT Hourly Aggregated Wind and Solar Output | 1h | 6 | 6 |
| ERCOT | ERCOT_AS | ERCOT Ancillary Services | 1m | 7 | 7 |
| ERCOT | ERCOT_AS_CAP | ERCOT System Ancillary Service Capacity Monitor | 1m, 15m | 55 | 55 |
| ERCOT | ERCOT_AS_OFFERS | ERCOT Total Ancillary Service Offers | 1h | 8 | 8 |
| ERCOT | ERCOT_AS_PROC_SASM | ERCOT Total Ancillary Service Procured in SASM | 1h | 1 | 6 |
| ERCOT | ERCOT_BC_LOAD_PROF | ERCOT Backcasted Load Profiles Extract | 15m | 1 | 264 |
| ERCOT | ERCOT_CF_RES | ERCOT Capacity Factors by Resource | weekly | 1 | 1,184 |
| ERCOT | ERCOT_CON_BAAL_EXC | ERCOT Consecutive BAAL Clock-Minute Exceedances | 1m | 1 | 1 |
| ERCOT | ERCOT_CRR_A_AR | ERCOT CRR Annual Auction Results | weekly | 1 | 0 |
| ERCOT | ERCOT_CRR_A_SHD_PRC | ERCOT CRR Annual Shadow Price | weekly | 1 | 0 |
| ERCOT | ERCOT_CRR_M_AR | ERCOT CRR Monthly Auction Results | weekly | 1 | 0 |
| ERCOT | ERCOT_CRR_M_SHD_PRC | ERCOT CRR Monthly Shadow Price | weekly | 1 | 0 |
| ERCOT | ERCOT_DAILY_RT_CONG | ERCOT Daily Real-Time Congestion, Exceeded Constraints Not Activated | daily | 1 | 1 |
| ERCOT | ERCOT_DAM_ASP | ERCOT DAM Ancillary Service Plan | 1h | 5 | 5 |
| ERCOT | ERCOT_DAM_CLRG_PRC_CAP | ERCOT DAM Clearing Prices for Capacity | 1h | 5 | 5 |
| ERCOT | ERCOT_DAM_LMP | ERCOT DAM Hourly LMPs | 1h | 1 | 19,365 |
| ERCOT | ERCOT_DAM_PTP_OR_SP | ERCOT DAM PTP Obligation Results by Settlement Point | 1h | 2 | 1,118 |
| ERCOT | ERCOT_DAM_SF | ERCOT DAM Shift Factors | 1h | 1 | 1 |
| ERCOT | ERCOT_DAM_SPP | ERCOT DAM Settlement Point Prices | 1h | 1 | 1,213 |
| ERCOT | ERCOT_DAM_TEPS | ERCOT DAM Total Energy Purchased and Sold | 1h | 2 | 1,283 |
| ERCOT | ERCOT_DC_TIE_OUT | ERCOT DC Tie Outage | 1h | 1 | 1 |
| ERCOT | ERCOT_ESR | ERCOT Energy Storage Resources | 5m, 15m | 4 | 4 |
| ERCOT | ERCOT_FUEL_MIX | ERCOT Fuel Mix | 5m | 2 | 16 |
| ERCOT | ERCOT_GEN_FUEL_MIX | ERCOT Generation Fuel Mix | 15m, daily | 2 | 20 |
| ERCOT | ERCOT_GEN_OUT | ERCOT Generation Outages | 5m | 8 | 9 |
| ERCOT | ERCOT_GMC_DEM | ERCOT Grid and Market Conditions Demand | 5m | 2 | 2 |
| ERCOT | ERCOT_GMC_SPLY | ERCOT Grid and Market Conditions Supply | 5m | 4 | 4 |
| ERCOT | ERCOT_GTL | ERCOT Generic Transmission Limits | 1h | 2 | 46 |
| ERCOT | ERCOT_HIST_NATIVE_LOAD | ERCOT Historical Native Load | 1h | 1 | 9 |
| ERCOT | ERCOT_IH_LOAD_FCST | ERCOT Intra-Hour Load Forecast by Weather Zone | 5m | 1 | 9 |
| ERCOT | ERCOT_IH_SW_FCST | ERCOT Intra-Hour Solar and Wind Forecast | 5m | 1 | 13 |
| ERCOT | ERCOT_LAMBDA | ERCOT System Lambda | 5m, 1h | 3 | 3 |
| ERCOT | ERCOT_LOAD_FCST_VS_ACT | ERCOT Load Forecast vs. Actual: Current Day | 1h | 5 | 5 |
| ERCOT | ERCOT_NSA_CNST | ERCOT NSA Constraints | 1m, 5m | 2 | 2 |
| ERCOT | ERCOT_OP_MSG | ERCOT Operations Messages | 5m | 1 | 1 |
| ERCOT | ERCOT_REG_DEP | ERCOT Total Amount of Regulation Service Deployed | 15m | 2 | 2 |
| ERCOT | ERCOT_RES_OUT_CAP | ERCOT Hourly Resource Outage Capacity | 1h | 9 | 45 |
| ERCOT | ERCOT_RNEW_INTG | ERCOT Renewable Integration | daily | 4 | 6 |
| ERCOT | ERCOT_RT_ORDC_ADDER_PRC | ERCOT Real-Time ORDC and Reliability Deployment Price Adders by SCED Interval | 5m | 3 | 3 |
| ERCOT | ERCOT_RT_ORDC_ADDER_RSV | ERCOT Real-Time ORDC and Reliability Deployment Reserves by SCED Interval | 5m | 27 | 27 |
| ERCOT | ERCOT_RT_ORDC_PRC | ERCOT Real-Time ORDC and Reliability Deployment Prices for 15-minute Settlement Interval | 15m | 3 | 3 |
| ERCOT | ERCOT_RT_SYS_DEM | ERCOT Real-Time System Conditions, Demand | 1m, 5m | 4 | 5 |
| ERCOT | ERCOT_RT_SYS_FLOW | ERCOT Real-Time System Conditions, Tie Flows | 1m, 5m, 15m | 4 | 18 |
| ERCOT | ERCOT_RT_SYS_FREQ | ERCOT Real-Time System Conditions, Frequency | 1m | 2 | 2 |
| ERCOT | ERCOT_RT_SYS_SPLY | ERCOT Real-Time System Conditions, Supply | 1m | 7 | 7 |
| ERCOT | ERCOT_RTD_LMP | ERCOT RTD Indicative LMPs by Resource Nodes Load Zones and Hubs | 5m | 1 | 1,105 |
| ERCOT | ERCOT_RTD_ORDC_ADDER_PRC | ERCOT RTD Indicative ORDC and Reliability Deployment Price Adders | 5m | 3 | 3 |
| ERCOT | ERCOT_RTD_ORDC_ADDER_RSV | ERCOT RTD Indicative ORDC and Reliability Deployment Reserves | 5m | 2 | 2 |
| ERCOT | ERCOT_RTM_BUS_LMP | ERCOT LMPs by Electrical Bus | 5m | 1 | 19,645 |
| ERCOT | ERCOT_RTM_LMP | ERCOT RTM Resource Nodes Load Zones and Hubs LMP | 5m | 2 | 1,230 |
| ERCOT | ERCOT_RTM_OP_DAY | ERCOT Real-Time Market Operating Day Extract | 15m | 1 | 13 |
| ERCOT | ERCOT_RTM_SPP | ERCOT RTM Settlement Point Prices | 15m | 1 | 1,213 |
| ERCOT | ERCOT_RUC_CD_RES | ERCOT Hourly RUC Committed or Decommitted Resources | 1h | 1 | 1 |
| ERCOT | ERCOT_RUC_CNST | ERCOT RUC Active and Binding Transmission Constraints | 5m, 1h | 3 | 3 |
| ERCOT | ERCOT_SASM_AGG_AS_OF | ERCOT SASM Aggregated Ancillary Service Offer Curve | 1h | 1 | 8 |
| ERCOT | ERCOT_SASM_MCPC_AS | ERCOT SASM MCPC by Ancillary Service Type | 1h | 1 | 5 |
| ERCOT | ERCOT_SCED_GR_AGG_OUT | ERCOT SCED Gen Resource Aggregate Outages | 15m | 1 | 1 |
| ERCOT | ERCOT_SCED_SF | ERCOT SCED Resource Shift Factors | 5m | 1 | 1 |
| ERCOT | ERCOT_SCED_VIOL_CNST | ERCOT Security Violations and Binding Transmission Constraints | 5m | 1 | 1 |
| ERCOT | ERCOT_SE_LOAD_FLOW | ERCOT State Estimator Load, DC Ties Flows | 1h | 1 | 5 |
| ERCOT | ERCOT_SE_LOAD_GEN | ERCOT State Estimator Load, Total Generation | 1h | 2 | 2 |
| ERCOT | ERCOT_SE_RT_TRANS_FLOW | ERCOT State Estimator Real-Time and Delayed Transmission Line Flows | 5m, 1h | 2 | 7,710 |
| ERCOT | ERCOT_SHD_PRC_CNST | ERCOT Shadow Prices and Binding Transmission Constraints | 5m, 1h | 2 | 2 |
| ERCOT | ERCOT_SMRY_HDL_LDL | ERCOT Summary Report of HDL and LDL | 5m | 3 | 3 |
| ERCOT | ERCOT_SOLAR | ERCOT Solar Power Production | 5m, 1h | 20 | 47 |
| ERCOT | ERCOT_ST_ADQ | ERCOT Short-Term System Adequacy | 1h | 9 | 25 |
| ERCOT | ERCOT_ST_WIND_FCST | ERCOT Short-Term Wind Power Forecast | 1h | 8 | 28 |
| ERCOT | ERCOT_SW_FCST | ERCOT Solar and Wind Power Forecast Monthly | 1h | 6 | 6 |
| ERCOT | ERCOT_SYS_DEM | ERCOT System-Wide Demand | 15m, 1h | 4 | 4 |
| ERCOT | ERCOT_TRANS_OUT | ERCOT Consolidated Transmission Outage | 1m | 1 | 3 |
| ERCOT | ERCOT_UNPL_RES_OUT | ERCOT Unplanned Resource Outages | 1h | 1 | 1 |
| ERCOT | ERCOT_VIOLAT_CNST | ERCOT Security Violations and Binding Transmission Constraints | 5m | 1 | 1 |
| ERCOT | ERCOT_WEATHER | ERCOT Weather Assumptions | 1h | 1 | 8 |
| ERCOT | ERCOT_WIND | ERCOT Wind Power Production | 5m, 1h | 11 | 63 |
| ERCOT | ERCOT_WSL | ERCOT Total Wholesale Storage Load | 15m | 1 | 1 |
| OTHER | EXCHG_RATE | Market Exchange Rates | 10m, daily | 14 | 14 |
| HYDROLOGY | FORTIS_KOOTENAY_DISCH | Fortis BC Kootenay Lake Discharge | daily | 1 | 1 |
| HYDROLOGY | FORTIS_KOOTENAY_LEVEL | Fortis BC Kootenay Lake Level | daily | 1 | 1 |
| EXCHANGES | ICE_DA_GAS | ICE Gas Day Ahead | daily | 1 | 276 |
| EXCHANGES | ICE_DA_POWER | ICE Power Day Ahead | daily | 1 | 158 |
| EXCHANGES | ICE_EOD | ICE End of Day Futures | daily | 3 | 1,485 |
| OTHER | IDAHO_LOAD | Idaho Power System Load and Wind Generation | 5m | 1 | 1 |
| HYDROLOGY | IDAHO_OUTFLOW | Idaho Power Hells Canyon Outflow | 15m | 2 | 2 |
| OTHER | IDAHO_SPLY | Idaho Power System Supply | 5m | 1 | 1 |
| IESO | IESO_18M_OTLK | IESO 18-Month Outlook | weekly | 1 | 11 |
| IESO | IESO_ADQ_DEM | IESO Adequacy, Demand | 1h | 12 | 18 |
| IESO | IESO_ADQ_IMP_EXP | IESO Adequacy, Import / Export | 1h | 9 | 35 |
| IESO | IESO_ADQ_SPLY | IESO Adequacy, Supply | 1h | 26 | 56 |
| IESO | IESO_DA_ADQ_DEM | IESO Day Ahead Adequacy, Demand | 1h | 14 | 36 |
| IESO | IESO_DA_ADQ_IMP_EXP | IESO Day Ahead Adequacy, Import / Export | 1h | 3 | 3 |
| IESO | IESO_DA_ADQ_SPLY | IESO Day Ahead Adequacy, Supply | 1h | 6 | 50 |
| IESO | IESO_DA_ENGY_PRC | IESO Day Ahead Hourly Energy LMP | 1h | 1 | 1,000 |
| IESO | IESO_DA_INTI_ENGY_LMP | IESO Day-Ahead Hourly Intertie Energy LMP | 1h | 1 | 18 |
| IESO | IESO_DA_INTI_OP_RES_LMP | IESO Day-Ahead Hourly Intertie Operating Reserve LMP | 1h | 2 | 36 |
| IESO | IESO_DA_OP_RES_LMP | IESO DAM Hourly Operating Reserve LMP | 1h | 3 | 3,069 |
| IESO | IESO_DA_OP_RSV_SF | IESO Day Ahead Area Operating Reserve Shortfall | 1h | 4 | 308 |
| IESO | IESO_DA_SHD_PRC | IESO Day-Ahead Shadow Prices | 1h | 4 | 2,188 |
| IESO | IESO_DA_VIRTUAL_ENGY_PRC | IESO Day Ahead Hourly Virtual Zonal Energy Prices | 1h | 1 | 9 |
| IESO | IESO_DA_ZONAL_ENGY_PRC | IESO Day Ahead Hourly Zonal Energy Price | 1h | 1 | 1 |
| IESO | IESO_DEM | IESO Ontario Demand | 1h | 6 | 6 |
| IESO | IESO_DISP_OP_RSV | IESO Dispatch Area Operating Reserve: Total Scheduled and Total Energy Called | 5m | 2 | 52 |
| IESO | IESO_DISP_OP_RSV_SF | IESO Dispatch Area Operating Reserve Shortfalls | 5m | 4 | 184 |
| IESO | IESO_FCST_SPLUS_BLOAD | IESO Forecast Surplus Baseload Generation | 1h | 1 | 1 |
| IESO | IESO_GEN_OAC | IESO Generators Output and Capability | 1h | 2 | 395 |
| IESO | IESO_HIST_INTF | IESO Monthly Historical Interface | 1h | 4 | 56 |
| IESO | IESO_HOEP | IESO Hourly Ontario Energy Price | 1h | 1 | 1 |
| IESO | IESO_INTI_SCH_FLOW | IESO Intertie Schedule and Flow | 5m, 1h | 6 | 59 |
| IESO | IESO_INTI_SCH_LIMIT | IESO Intertie Scheduling Limits | 1h | 3 | 84 |
| IESO | IESO_NISL_SHD_PRC | IESO NISL Shadow Prices | 1h | 3 | 42 |
| IESO | IESO_NODAL_PRC | IESO Hourly Nodal Price Report | 1h | 1 | 15 |
| IESO | IESO_PREDISP_CSTRD | IESO Predispatch Constrained Totals | 1h | 4 | 5 |
| IESO | IESO_PREDISP_CSTRD_TOT | IESO Predispatch Constrained Totals | 1h | 1 | 1 |
| IESO | IESO_PREDISP_ENGY_PRC | IESO PreDispatch Hourly Energy LMP | 1h | 1 | 996 |
| IESO | IESO_PREDISP_INTI_ENGY_LMP | IESO Pre-Dispatch Hourly Intertie Energy LMP | 1h | 1 | 18 |
| IESO | IESO_PREDISP_INTI_OP_RES_LMP | IESO Pre-Dispatch Hourly Intertie Operating Reserve LMP | 1h | 2 | 36 |
| IESO | IESO_PREDISP_OP_RSV_SF | IESO Predispatch Area Operating Reserve Shortfalls | 1h | 4 | 160 |
| IESO | IESO_PREDISP_PRC | IESO Predispatch Market Price | 1h | 6 | 48 |
| IESO | IESO_PREDISP_SHD_PRC | IESO Predispatch Shadow Prices | 1h | 4 | 1,934 |
| IESO | IESO_PREDISP_VIRTUAL_ENGY_PRC | IESO Predispatch Hourly Virtual Zonal Energy Price | 1h | 1 | 9 |
| IESO | IESO_PREDISP_ZONAL_ENGY_PRC | IESO Predisp Hourly Zonal Energy Price | 1h | 1 | 1 |
| IESO | IESO_RT_CON_OP_RSV | IESO Realtime Constrained Operating Reserve in Market | 5m | 2 | 3 |
| IESO | IESO_RT_CSTRD | IESO Realtime Constrained Totals | 5m | 4 | 4 |
| IESO | IESO_RT_CSTRD_TOT | IESO Realtime Constrained Totals | 5m | 1 | 2 |
| IESO | IESO_RT_ENGY_PRC | IESO Real Time 5 Min Energy LMP | 5m | 1 | 1,002 |
| IESO | IESO_RT_INTI_ENGY_LMP | IESO Real Time 5 Min Intertie Energy LMP | 5m | 1 | 18 |
| IESO | IESO_RT_INTI_OP_RES_LMP | IESO Realtime 5-Min Intertie Operating Reserve LMP | 5m | 2 | 36 |
| IESO | IESO_RT_OP_RES_LMP | IESO Realtime 5 Min Operating Reserve LMP | 5m | 3 | 3,069 |
| IESO | IESO_RT_PRC | IESO Realtime Market Price | 5m | 5 | 49 |
| IESO | IESO_RT_SHD_PRC | IESO Realtime Shadow Prices | 5m | 1 | 528 |
| IESO | IESO_RT_VIRTUAL_ENGY_PRC | IESO Real Time 5 Min Virtual Zonal Energy Prices | 5m | 1 | 9 |
| IESO | IESO_RT_ZONAL_ENGY_PRC | IESO Realtime Ontario Zonal Energy Prices | 5m | 1 | 1 |
| IESO | IESO_TR_ZONAL_PRC | IESO TR Hourly Zonal Price | 1h | 1 | 15 |
| IESO | IESO_TRA_LT1 | IESO TRA Post Auction Long Term Round 1 | weekly | 1 | 16 |
| IESO | IESO_TRA_LT2 | IESO TRA Post Auction Long Term Round 2 | weekly | 1 | 16 |
| IESO | IESO_TRA_ST | IESO TRA Post Auction Short Term | weekly | 1 | 16 |
| IESO | IESO_TRANS_OUT | IESO Transmission Facility Outage Limits Report | 1m | 2 | 2 |
| IESO | IESO_UPLIFT_INTI_OGE | IESO Hourly Uplift and Intertie Offer Guarantee Estimates | 1h | 3 | 3 |
| IESO | IESO_VRBL_GEN_FCST | IESO Variable Generation Forecast Summary | 1h | 4 | 21 |
| IESO | IESO_ZONAL_DEM | IESO 5 min Zonal Demand | 5m | 1 | 13 |
| ISO-NE | ISONE_3D_RR_DEM_FCST | ISO-NE Three-Day Reliability Region Demand Forecast | 1h | 1 | 8 |
| ISO-NE | ISONE_3D_SYS_DEM_FCST | ISO-NE Three-Day System Demand Forecast | 1h | 1 | 1 |
| ISO-NE | ISONE_5MIN_RSV_REQ | ISO-NE Five-Minute Reserve Requirements | 5m | 6 | 24 |
| ISO-NE | ISONE_5MIN_RSV_REQ_PRC | ISO-NE Five-Minute Reserve Requirements Price | 5m | 3 | 12 |
| ISO-NE | ISONE_7D_CAP_FCST | ISO-NE Seven-Day Capacity Forecast | daily | 8 | 8 |
| ISO-NE | ISONE_7D_PEAK_LOAD_FCST | ISO-NE Seven-Day Projected Peak Load | daily | 1 | 1 |
| ISO-NE | ISONE_7D_WIND_FCST | ISO-NE Seven Day Wind Power Forecast | 1h | 1 | 1 |
| ISO-NE | ISONE_AUCTION_PRC | ISO-NE FTR Auction Clearing Prices | weekly | 2 | 0 |
| ISO-NE | ISONE_AUCTION_RESULTS | ISO-NE FTR Auction Results | weekly | 2 | 0 |
| ISO-NE | ISONE_CNST | ISO-NE Final Real-Time 15-Minute Binding Constraints | 5m, 15m | 4 | 4 |
| ISO-NE | ISONE_DA_AS_STRIKE_PRC | ISO-NE Day Ahead Ancillary Services Strike Prices | 1h | 2 | 2 |
| ISO-NE | ISONE_DA_CLRD_DEM | ISO-NE Hourly Day-Ahead Cleared Demand | 1h | 1 | 10 |
| ISO-NE | ISONE_DA_CLRD_FLOW | ISO-NE Day Ahead Cleared Flows | 1h | 1 | 43 |
| ISO-NE | ISONE_DA_CNST | ISO-NE Day-Ahead Binding Constraints | 1h | 1 | 1 |
| ISO-NE | ISONE_DA_ENGY_LMP | ISO-NE Day-Ahead Energy Market Hourly LMP | 1h | 1 | 1,380 |
| ISO-NE | ISONE_DA_NET_TIE_SCH | ISO-NE Day-Ahead Net Tie Schedules | 1h | 1 | 6 |
| ISO-NE | ISONE_DAM_LMP | ISO-NE Hourly Day-Ahead LMPS | 1h | 2 | 1,381 |
| ISO-NE | ISONE_FINAL_5MIN_REG_CLRG_PRC | ISO-NE Final Five-Minute Regulation Clearing Prices | 5m | 2 | 2 |
| ISO-NE | ISONE_GEN_FUEL_TYPE | ISO-NE Daily Generation by Fuel Type | 5m, 1h | 3 | 17 |
| ISO-NE | ISONE_HRLY_LMP | ISO-NE Real-Time Hourly LMP | 1h | 2 | 1,313 |
| ISO-NE | ISONE_HRLY_RSV_REQ | ISO-NE Hourly Reserve Requirements | 1h | 6 | 24 |
| ISO-NE | ISONE_HRLY_RSV_REQ_PRC | ISO-NE Hourly Reserve Requirements Price | 1h | 3 | 12 |
| ISO-NE | ISONE_MAIN_SCH | ISO-NE Annual Maintenance Schedule | weekly | 11 | 11 |
| ISO-NE | ISONE_MAIN_SCH_DEM | ISO-NE Annual Maintenance Schedule Demand | weekly | 1 | 1 |
| ISO-NE | ISONE_MREP_IMP_EXP | ISO-NE Morning Report, Import / Export | daily | 1 | 1 |
| ISO-NE | ISONE_MREP_SPLY | ISO-NE Morning Report, Supply | daily | 11 | 11 |
| ISO-NE | ISONE_OUTAGE | ISO-NE Long Term and Short Term Outages | 15m | 2 | 0 |
| ISO-NE | ISONE_PRELIM_5MIN_REG_CLRG_PRC | ISO-NE Preliminary Five-Minute Regulation Clearing Prices | 5m | 2 | 2 |
| ISO-NE | ISONE_RES_MIX | ISO-NE Resource Mix | 5m | 1 | 10 |
| ISO-NE | ISONE_RT_5MIN_LOAD | ISO-NE Real-Time Five-Minute System Load | 5m | 4 | 4 |
| ISO-NE | ISONE_RT_HRLY_LOAD | ISO-NE Real-Time Hourly System Load | 1h | 3 | 10 |
| ISO-NE | ISONE_RT_INTC | ISO-NE Real-Time Actual Five-Minute Scheduled Interchange | 5m | 1 | 7 |
| ISO-NE | ISONE_RTM_LMP | ISO-NE Real-Time Five-Minute LMPs | 5m | 2 | 1,265 |
| ISO-NE | ISONE_SCH_INTC | ISO-NE Actual Scheduled Interchange | 1h | 1 | 6 |
| ISO-NE | ISONE_SMD | ISO-NE SMD Hourly | 1h | 1 | 9 |
| ISO-NE | ISONE_SS_CONT | ISO-NE Single-Source Contingency | 5m | 6 | 33 |
| ISO-NE | ISONE_SYS_NOTICE | ISO-NE Emergency Operations System Notices | 1h | 1 | 1 |
| ISO-NE | ISONE_TTC_EXT_LIMITS | ISO-NE TTC External Interface Limits | 1h | 1 | 12 |
| MEXICO | MEXICO_AS_RSV | MEXICO Related Services by Reserve Zone | 1h | 4 | 12 |
| MEXICO | MEXICO_DAM_AS_PRC | MEXICO MDA Related Services Prices | 1h | 5 | 15 |
| MEXICO | MEXICO_DAM_AS_REQ | MEXICO MDA Related Services Requirements | 1h | 4 | 12 |
| MEXICO | MEXICO_DAM_LMP | MEXICO Local Marginal Prices MDA | 5m, 1h | 7 | 2,753 |
| MEXICO | MEXICO_DAM_TFSR_CAP | MEXICO Transfer Capacity in International Links for the MDA | 1h | 8 | 64 |
| MEXICO | MEXICO_DEM | MEXICO Demand | 1h | 2 | 20 |
| MEXICO | MEXICO_ENGY_ALLOC | MEXICO Electricity by Load Zone | 1h | 3 | 495 |
| MEXICO | MEXICO_EST_RT_DEM | MEXICO Estimation of Real Demand | 1h | 5 | 144 |
| MEXICO | MEXICO_RSV_ALLOC | MEXICO Allocation by Market Participant | 1h | 6 | 1,098 |
| MEXICO | MEXICO_RTM_LMP | MEXICO Local Marginal Prices MTR | 1h | 7 | 2,757 |
| MEXICO | MEXICO_SPLY | MEXICO Supply | 1h | 1 | 10 |
| MISO | MISO_7D_FCST | MISO 7 Day Forecast | 1h | 2 | 8 |
| MISO | MISO_ACE | MISO ACE Chart | 1m | 1 | 1 |
| MISO | MISO_AS_MCP | MISO Ancillary Market MCP | 5m | 18 | 144 |
| MISO | MISO_CNST_DA | MISO Binding Constraints Day-Ahead Market | 5m | 1 | 1 |
| MISO | MISO_CNST_RT | MISO Binding Constraints Real-Time Market | 5m | 1 | 1 |
| MISO | MISO_CNST_RT_HIST | MISO Binding Constraints Historical Real-Time Market | 5m | 1 | 1 |
| MISO | MISO_DA_EXPD_REGN_DEM | MISO Day-Ahead Expanded by Region, Demand | 1h | 4 | 20 |
| MISO | MISO_DA_EXPD_REGN_INTC | MISO Day-Ahead Expanded by Region, Interchange | 1h | 1 | 13 |
| MISO | MISO_DA_EXPD_REGN_SPLY | MISO Day-Ahead Expanded by Region, Supply | 1h | 12 | 60 |
| MISO | MISO_DA_RT_SOLAR | MISO Day-Ahead And Real-Time Solar | 1h | 4 | 4 |
| MISO | MISO_DAM_EXANTE_LMP | MISO Day-Ahead Market ExAnte LMPs | 1h | 1 | 3,249 |
| MISO | MISO_DAM_LMP | MISO Day-Ahead Market ExPost LMPs | 1h | 1 | 3,343 |
| MISO | MISO_DEM | MISO Demand | 5m, 1h | 3 | 3 |
| MISO | MISO_FUEL_MIX | MISO Fuel Mix | 1h | 1 | 7 |
| MISO | MISO_HIST_WIND | MISO Historical Hourly Wind Generation | 1h | 1 | 1 |
| MISO | MISO_HRLY_LMP | MISO Hourly LMP | 1h | 1 | 3,393 |
| MISO | MISO_LOAD_RES_ZONE | MISO Daily Forecast and Actual Load by Local Resource Zone | 1h | 2 | 20 |
| MISO | MISO_LT_OUT | MISO Long-Term Outage Schedule Report | weekly | 3 | 3 |
| MISO | MISO_NET_SCH_INTC | MISO Net Scheduled Interchange | 5m | 1 | 15 |
| MISO | MISO_PLN_HRLY_OUT | MISO Transmission Planned Outage Hourly | 5m | 1 | 1 |
| MISO | MISO_RT_EXPD | MISO Real-Time Expanded | 1h | 15 | 15 |
| MISO | MISO_RT_INTRA_FLOW | MISO Real-Time Intraregional Scheduled Flow | 5m | 1 | 2 |
| MISO | MISO_RT_NOTIFICATION | MISO Notifications, Real-Time Operations | 5m | 1 | 1 |
| MISO | MISO_RT_OUT | MISO Transmission Real-Time Outages | 5m | 1 | 1 |
| MISO | MISO_RT_SE_GEN_FUEL_MIX | MISO Real-Time State Estimator Generation Fuel Mix | 1h | 2 | 70 |
| MISO | MISO_RTM_EXANTE_LMP | MISO RTM ExAnte LMP | 5m | 1 | 7 |
| MISO | MISO_RTM_LMP | MISO RTM Locational Marginal Prices | 5m | 1 | 2,879 |
| MISO | MISO_TIE_FLOW | MISO Tie Flow | 5m | 1 | 1 |
| OTHER | NB_LOAD | NB Power System Information Load | 5m, 1h | 3 | 3 |
| OTHER | NB_NET_SCH | NB Power System Information Net Scheduled | 5m | 1 | 5 |
| OTHER | NDMC_DROUGHT | NDMC US Drought Monitor | weekly | 6 | 6 |
| OTHER | NE_AGG_PRICE | North East ISO Weighted Price (IESO NYISO ISONE PJM) | 1h | 1 | 1 |
| OTHER | NERC_CRC | NERC CRC Events | 1m | 1 | 1 |
| OTHER | NERC_SYS_FLOW | NERC System Flows | 5m | 1 | 87 |
| EXCHANGES | NGX_SETTLES | NGX Settlement Price, Gas and Power | daily | 1 | 194 |
| OTHER | NMISA_LOAD | NMISA Actual Region Loads | daily | 1 | 3 |
| OTHER | NRC_STATUS | US NRC Power Reactor Status | daily | 2 | 107 |
| OTHER | NVE_LOAD | NV Energy Load Summary | 1h | 4 | 4 |
| OTHER | NVE_TIE | NV Energy Tie Summary | 1h | 1 | 7 |
| HYDROLOGY | NWFRC_STP_FCST | NWRFC STP Extended Forecast | daily | 5 | 113 |
| HYDROLOGY | NWFRC_STP_HEIGHT_FCST | NWRFC STP Extended Stage and Elevation Forecast | daily | 2 | 3 |
| OTHER | NWPP_LOAD | NWPP Aggregated Geographic Area Load | 1h | 1 | 1 |
| OTHER | NWPP_SPLY | NWPP Aggregated Geographic Area Wind/Solar/Gen | 1h | 3 | 3 |
| HYDROLOGY | NWRFC_HYDRO | NWRFC River Information and Forecasts | 1h, daily | 4 | 217 |
| HYDROLOGY | NWRFC_RIVER | NWRFC River Conditions | 15m | 1 | 1,030 |
| HYDROLOGY | NWRFC_WATER_SPLY | NWFRC Water Supply Monthly Volumes | weekly | 1 | 126 |
| HYDROLOGY | NWRFC_WSF | NWRFC Water Supply Forecasts | daily | 1 | 120 |
| WEATHER | NWS_2D_FCST | NWS 48 Hour Forecast | 1h | 1 | 5 |
| WEATHER | NWS_7D_FCST | NWS National Blend of Models Forecast | daily | 1 | 438 |
| WEATHER | NWS_CAN_7D_FCST | NWS National Blend of Models Forecast, Canada | daily | 1 | 14 |
| WEATHER | NWS_HEAT_COOL_DD | NWS Heating / Cooling Degree Day Summary | weekly | 2 | 104 |
| WEATHER | NWS_HRLY_ACTUAL | NWS Weather Observations | 1h | 1 | 545 |
| NYISO | NYISO_ATC_TTC | NYISO ATC/TTC | 1h | 4 | 104 |
| NYISO | NYISO_BID_LOAD | NYISO Zonal Bid Load | 1h | 5 | 55 |
| NYISO | NYISO_BMA_SMRY | NYISO Balancing Market Advisory Summary | 1h | 1 | 6 |
| NYISO | NYISO_CNST | NYISO Day-Ahead Market Limiting Constraints | daily | 2 | 2 |
| NYISO | NYISO_DA_AS_PRC | NYISO Ancillary Service Prices, Day-Ahead | 1h | 4 | 44 |
| NYISO | NYISO_DA_SCH_OUT | NYISO Day-Ahead Scheduled Outages | 1m | 1 | 1 |
| NYISO | NYISO_DAM_ENGY_DEM | NYISO Day-Ahead Market Daily Energy, Demand | 1h | 12 | 12 |
| NYISO | NYISO_DAM_ENGY_IMP_EXP | NYISO Day-Ahead Market Daily Energy, Import / Export | 1h | 3 | 33 |
| NYISO | NYISO_DAM_ENGY_SPLY | NYISO Day-Ahead Market Daily Energy, Supply | 1h | 25 | 25 |
| NYISO | NYISO_DAM_LBMP | NYISO Day-Ahead Market LBMP | 1h | 1 | 759 |
| NYISO | NYISO_DAM_REF_BUS_LBMP | NYISO Reference Bus LBMP, Day-Ahead | 1h | 1 | 1 |
| NYISO | NYISO_EST_BTM_SOLAR | NYISO BTM Solar Estimated Actuals | 1h | 1 | 12 |
| NYISO | NYISO_GEN_MAIN | NYISO Generation Maintenance | daily | 1 | 1 |
| NYISO | NYISO_INTG_RT_LOAD | NYISO Integrated Real-Time Actual Load | 1h | 1 | 12 |
| NYISO | NYISO_INTI_FLOW | NYISO Internal and External Transmission Interface Limits and Flows | 5m | 1 | 19 |
| NYISO | NYISO_LAKE_ERIE | NYISO Lake Erie Circulation | 5m | 2 | 2 |
| NYISO | NYISO_LOAD_FCST | NYISO ISO Load Forecast | 1h | 1 | 12 |
| NYISO | NYISO_M_AUC_RESULT | NYISO Monthly Auction Results for UCAP | weekly | 3 | 11 |
| NYISO | NYISO_MSG | NYISO Operational Announcements | 5m | 2 | 2 |
| NYISO | NYISO_PAR_FLOW | NYISO Phase Angle Regulator Flows and Schedules | 5m, 1h | 3 | 111 |
| NYISO | NYISO_RT_AS_PRC | NYISO Ancillary Service Prices, Real-Time | 5m | 5 | 55 |
| NYISO | NYISO_RT_FUEL_MIX | NYISO Real-Time Fuel Mix | 5m | 7 | 7 |
| NYISO | NYISO_RT_LOAD | NYISO Real-Time Actual Load | 5m | 1 | 12 |
| NYISO | NYISO_RTC_AS | NYISO Real-Time Commitment Ancillary Services | 15m | 5 | 56 |
| NYISO | NYISO_RTC_LBMP | NYISO Real-Time Commitment LBMP, Zonal | 15m | 1 | 11 |
| NYISO | NYISO_RTM_LBMP | NYISO Real-Time Market LBMP | 5m | 2 | 759 |
| NYISO | NYISO_SPOT_AUC_RESULT | NYISO Spot Market Auction Results for UCAP | weekly | 3 | 11 |
| NYISO | NYISO_STRIP_AUC_RESULT | NYISO Strip Auction Results for UCAP | weekly | 3 | 11 |
| NYISO | NYISO_TRANS_LIMIT | NYISO Transfer Limitations | daily | 1 | 1 |
| NYISO | NYISO_TRANS_RT_OUT | NYISO Real-Time Actual Outages | 1h | 1 | 1 |
| NYISO | NYISO_TRANS_RT_SCH_OUT | NYISO Real-Time Scheduled Outages | 1m | 1 | 1 |
| NYISO | NYISO_TWI_RT_LBMP | NYISO Time Weighted/Integrated Real-Time LBMP | 1h | 2 | 759 |
| NYISO | NYISO_TWI_RT_REF_BUS_LBMP | NYISO Reference Bus LBMP, Time Weighted/Integrated Real-Time | 1h | 1 | 1 |
| NYISO | NYISO_WEATHER | NYISO Weather Forecast | daily | 2 | 36 |
| OTHER | PACIFICORP_RT | PacifiCorp Real Time Data | 15m | 1 | 3 |
| WEATHER | PGE_COMP_TEMP | PG&E Composite Temperature | daily | 2 | 2 |
| WEATHER | PGE_CUR_STATUS | PG&E Current Pipeline Status | daily | 22 | 46 |
| WEATHER | PGE_SPLY_DEM_ARCH | PG&E Supply and Demand Archives | daily | 12 | 30 |
| PJM | PJM_5MIN_EMIS | PJM Five Minute Marginal Emission Rates | 5m | 1 | 10,843 |
| PJM | PJM_5MIN_FLOW | PJM Five Minute Tie Flows | 5m | 2 | 42 |
| PJM | PJM_5MIN_LOAD_FCST | PJM Five Minute Load Forecast | 5m | 1 | 25 |
| PJM | PJM_5MIN_SOLAR | PJM Five Minute Solar Generation | 5m | 1 | 1 |
| PJM | PJM_5MIN_SW_FCST | PJM Five Minute Solar and Wind Power Forecast | 5m | 3 | 3 |
| PJM | PJM_7D_LOAD_FCST | PJM Seven-Day Load Forecast | 1h | 3 | 75 |
| PJM | PJM_ACE | PJM Area Control Error | 1m | 1 | 1 |
| PJM | PJM_ACT_LOAD | PJM Actual Load | 1h | 3 | 66 |
| PJM | PJM_AS | PJM Ancillary Services | 1h | 1 | 1 |
| PJM | PJM_CNST | PJM Constraints | 5m | 1 | 1 |
| PJM | PJM_DA_AS_PRC | PJM Day-Ahead Ancillary Service Market Results, Price | 1h | 6 | 10 |
| PJM | PJM_DA_AS_RSV | PJM Day-Ahead Ancillary Service Market Results, Reserve | 1h | 16 | 27 |
| PJM | PJM_DA_FLOW_LIMIT | PJM Day Ahead Interface Flows and Limits | 1h | 2 | 10 |
| PJM | PJM_DA_TRANS_CNST | PJM Day-Ahead Transmission Constraints | 5m | 1 | 1 |
| PJM | PJM_DAILY_UPLIFT | PJM Daily Uplift by Zone | daily | 7 | 137 |
| PJM | PJM_DAILY_UPLIFT_CRED | PJM Daily Uplift Credits by Zone | daily | 1 | 20 |
| PJM | PJM_DAM_LMP | PJM Day-Ahead Hourly LMPs | 1h | 2 | 16,605 |
| PJM | PJM_DISP_RATE | PJM Instantaneous Dispatch Rates | 1m | 1 | 19 |
| PJM | PJM_EMERG_MSG | PJM Emergency Messages | 5m | 1 | 1 |
| PJM | PJM_EXP_STATE | PJM Hourly Net Exports by State | 1h | 1 | 14 |
| PJM | PJM_FCST_GEN_OUT | PJM Forecast Generation Outages | daily | 5 | 15 |
| PJM | PJM_FCST_LOAD | PJM Forecasted Load | 1h | 3 | 9 |
| PJM | PJM_FTR_A_AR | PJM Annual FTR Auction Results | weekly | 1 | 0 |
| PJM | PJM_FTR_A_OB_PRC | PJM FTR Annual Obligation Nodal Prices | daily | 1 | 0 |
| PJM | PJM_FTR_A_OPT_PRC | PJM FTR Annual Option Path Clearing Prices | daily | 1 | 0 |
| PJM | PJM_FTR_LMP | PJM Monthly Financial Transmission Rights Zonal LMP | 1h | 1 | 49 |
| PJM | PJM_FTR_LT_AR | PJM Long Term FTR Auction Result | weekly | 1 | 0 |
| PJM | PJM_FTR_LT_OB_PRC | PJM FTR Long Term Obligation Nodal Prices | daily | 1 | 0 |
| PJM | PJM_FTR_M_AR | PJM Monthly FTR Auction Results | weekly | 1 | 0 |
| PJM | PJM_FTR_M_OB_PRC | PJM FTR Monthly Obligation Nodal Prices | daily | 1 | 0 |
| PJM | PJM_FTR_M_OPT_PRC | PJM FTR Monthly Option Path Clearing Prices | daily | 1 | 0 |
| PJM | PJM_GEN_FUEL_TYPE | PJM Generation by Fuel Type | 1h | 11 | 11 |
| PJM | PJM_HIST_GEN | PJM Generation and Extra High Voltage Losses | 1h | 1 | 1 |
| PJM | PJM_HRLY_AS_LMP | PJM Real-Time Ancillary Service Hourly LMP | 5m | 6 | 9 |
| PJM | PJM_HRLY_LMP | PJM Real-Time Hourly LMPs | 1h | 2 | 15,801 |
| PJM | PJM_INT_FLOW | PJM Transfer Interface Flow | 5m | 1 | 11 |
| PJM | PJM_ITSCED_LMPS | PJM Five Minute ITSCED LMPS | 5m | 1 | 5 |
| PJM | PJM_LOAD | PJM Instantaneous Load | 5m | 2 | 28 |
| PJM | PJM_MARG_VAL | PJM Real-Time Marginal Value | 5m, 1h | 2 | 2 |
| PJM | PJM_MRKT_RAMP | PJM Joint and Common Market Ramp | 15m | 4 | 8 |
| PJM | PJM_OP_RSV_RATE_PRELIM | PJM Operating Reserve Rates, Preliminary | daily | 3 | 7 |
| PJM | PJM_REG_PRELIM_BILL | PJM Regulation Zone Preliminary Billing Data | 1h | 4 | 4 |
| PJM | PJM_REG_PRELIM_BILL_PRC | PJM Regulation Zone Preliminary Billing Data Price | 1h | 2 | 2 |
| PJM | PJM_RT_AS_LMP | PJM Real-Time Ancillary Service Five-Minute LMP | 5m | 8 | 15 |
| PJM | PJM_RT_INTC | PJM Real-Time Scheduled Interchange | 1h | 1 | 20 |
| PJM | PJM_RT_TRANS_OUT | PJM Real Time Transmission Outages | daily | 1 | 0 |
| PJM | PJM_RTM_LMP | PJM Real-Time Five Minute LMPs | 5m | 1 | 14,862 |
| PJM | PJM_SCH_TRANS_OUT | PJM Scheduled Transmission Outages | daily | 1 | 0 |
| PJM | PJM_SET_5MIN_LMPS | PJM Settlements Verified Five Minute LMPs | 5m | 2 | 347 |
| PJM | PJM_SOLAR_WIND | PJM Solar and Wind Generation | 1h | 2 | 11 |
| PJM | PJM_SW_FCST | PJM Hourly Solar and Wind Power Forecast | 5m, 1h | 5 | 5 |
| PJM | PJM_WIND | PJM Instantaneous Wind Generation | 1m | 1 | 1 |
| HYDROLOGY | PNW_BW_INDEX | NRCS CRWMG SNOTEL Basin-Wide Index | daily | 1 | 16 |
| HYDROLOGY | PNW_SWE | NRCS CRWMG SNOTEL Snow Water Equivalent | daily | 1 | 175 |
| OTHER | SOCAL_DAILY_OP | SoCal Gas Daily Options Gas | daily | 2 | 51 |
| OTHER | SOCAL_HRLY_OP | SoCal Gas Hourly Operations | 1h | 8 | 29 |
| SPP | SPP_ACE | SPP ACE Chart | 1m | 1 | 1 |
| SPP | SPP_CNST | SPP Binding Constraints | 5m | 2 | 2 |
| SPP | SPP_DA_MRKT_CLRG | SPP Day-Ahead Market Clearing | 1h | 13 | 13 |
| SPP | SPP_DA_MRKT_CLRG_GEN | SPP Day-Ahead Market Clearing Gen | 1h | 1 | 1 |
| SPP | SPP_DA_MRKT_CLRG_PRC | SPP Day-Ahead Market Clearing Price | 1h | 3 | 3 |
| SPP | SPP_DAM_BUS_LMP | SPP Day-Ahead Market LMP By Bus | 1h | 1 | 8,928 |
| SPP | SPP_DAM_LMP | SPP Day-Ahead Market LMP By Location | 1h | 1 | 1,589 |
| SPP | SPP_DAM_MCP | SPP DAM MCP | 1h | 4 | 36 |
| SPP | SPP_GEN_CAP_FUEL_TYPE | SPP Hourly Generation Capacity By Fuel Type | 1h | 1 | 11 |
| SPP | SPP_GEN_MIX | SPP Generation Mix | 1h | 1 | 12 |
| SPP | SPP_GEN_OUT | SPP Generation Outage | 1h | 1 | 11 |
| SPP | SPP_LOAD | SPP Hourly Load | 1h | 1 | 17 |
| SPP | SPP_MT_DEM_FCST | SPP Mid Term Resource Forecast, Demand | 5m, 1h | 4 | 6 |
| SPP | SPP_MT_RES_FCST | SPP Mid Term Resource Forecast | 1h | 1 | 2 |
| SPP | SPP_OP_RSV | SPP Operating Reserve | 5m | 6 | 36 |
| SPP | SPP_RES_FCST_RSV_ZONE | SPP Resource Forecast By Reserve Zone | 1h | 4 | 20 |
| SPP | SPP_RTM_BUS_LMP | SPP Real-Time Balancing Market LMP By Bus | 5m | 1 | 8,488 |
| SPP | SPP_RTM_LMP | SPP Real-Time Balancing Market LMP By Location | 5m | 1 | 1,519 |
| SPP | SPP_RTM_MCP | SPP RTM MCP | 5m | 8 | 48 |
| SPP | SPP_SMRY_FCST_DEM | SPP Summary Forecast, Demand | 5m, 1h | 3 | 5 |
| SPP | SPP_SMRY_FCST_SPLY | SPP Summary Forecast, Supply | 5m, 1h | 6 | 6 |
| SPP | SPP_ST_RES | SPP Short Term Resource Actual | 5m | 2 | 4 |
| SPP | SPP_TCR_A_AR | SPP Annual Transmission Congestion Rights Auction Results | weekly | 1 | 0 |
| SPP | SPP_TCR_A_CP | SPP Annual Transmission Congestion Rights Clearing Prices | weekly | 1 | 0 |
| SPP | SPP_TCR_M_AR | SPP Monthly Transmission Congestion Rights Auction Results | weekly | 1 | 0 |
| SPP | SPP_TCR_M_CP | SPP Monthly Transmission Congestion Rights Clearing Prices | weekly | 1 | 0 |
| SPP | SPP_TIE_FLOW | SPP Tie Flows | 1h | 1 | 26 |
| SPP | SPP_TRANS_OUT | SPP Transmission Outages | daily | 1 | 1 |
| SPP | SPP_VER_CURT | SPP VER Curtailments | 5m | 2 | 2 |
| SPP | SPP_WEIS_5MIN_INTC | SPP WEIS Five Minute Interchange Trend | 5m | 1 | 2 |
| SPP | SPP_WEIS_CNST | SPP WEIS Binding Constraints | 5m | 1 | 1 |
| SPP | SPP_WEIS_FCST_SMRY_DEM | SPP WEIS Forecast Summary, Demand | 5m | 1 | 1 |
| SPP | SPP_WEIS_FCST_SMRY_SPLY | SPP WEIS Forecast Summary, Supply | 5m | 1 | 2 |
| SPP | SPP_WEIS_GEN_MIX | SPP WEIS Gen Mix | 5m | 1 | 20 |
| SPP | SPP_WEIS_HRLY_GEN_CAP_FUEL_TYPE | SPP WEIS Hourly Gen Capacity By Fuel Type | 1h | 1 | 11 |
| SPP | SPP_WEIS_HRLY_LOAD | SPP WEIS Hourly Load | 1h | 1 | 3 |
| SPP | SPP_WEIS_LOAD_GEN_MIX | SPP WEIS Load Gen Mix | 5m | 1 | 1 |
| SPP | SPP_WEIS_RTM_BUS_LMP | SPP WEIS Real-Time LMP By Bus | 5m | 1 | 781 |
| SPP | SPP_WEIS_RTM_LMP | SPP WEIS Real-Time LMP By Settlement Location | 5m | 1 | 159 |
| SPP | SPP_WHOLE_PAY | SPP Make Whole Payment | daily | 2 | 6 |
| OTHER | SWPA_GEN | SWPA Generation | 1h | 1 | 18 |
| OTHER | TC_DA_EXPD | Trans Canada Day Ahead Expanded | 30m | 12 | 12 |
| OTHER | TC_DA_EXPD_LP | Trans Canada Day Ahead Expanded Linepack | 30m, 1h | 2 | 4 |
| OTHER | TC_DAILY_OP_PLAN | Trans Canada NGTL/FH Daily Operating Plan | daily | 2 | 2 |
| OTHER | TC_GAS_DAY | Trans Canada Gas Day Summary | daily | 4 | 4 |
| OTHER | TC_GAS_DAY_ACC | Trans Canada NGTL System Gas Day SD and OBA Accounts | daily | 2 | 2 |
| OTHER | TC_GAS_DAY_TOL | Trans Canada Gas Day Summary Tolerance | daily | 2 | 2 |
| OTHER | TC_GAS_NOM_SMRY | Trans Canada NGTL System Gas Day Summary | daily | 3 | 43 |
| OTHER | TC_GAS_SCH_NOM | Trans Canada NGTL System Gas Day Scheduled Deliveries | daily | 2 | 69 |
| OTHER | TC_GTN_AVAIL_CAP | Trans Canada GTN Operationally Available Capacity | daily | 1 | 55 |
| OTHER | TC_HIST_CAPABILITY | Trans Canada Historical Delivery Capabilities | daily | 1 | 1 |
| OTHER | TC_OP_STATUS | Trans Canada Mainline Operation Status Bulletin | daily | 2 | 13 |
| OTHER | TC_ST_OUT_PLAN | Trans Canada Short Term Outage Plan | daily | 2 | 5 |
| HYDROLOGY | USACE_HYDRO | USACE Daily Project Data | 1h, daily | 2 | 7 |
| HYDROLOGY | USACE_HYDRO_AGG | USACE Hourly Project Data | 1h | 3 | 3 |
| HYDROLOGY | USACE_HYDRO_DET | USACE Hourly Project Data Detailed | 1h | 1 | 27 |
| HYDROLOGY | USACE_SPLY | USACE Hourly Project Data Generation | 1h | 2 | 23 |
| HYDROLOGY | USGS_DAILY | USGS Surface-Water Daily Data | daily | 1 | 37 |
| HYDROLOGY | USGS_RT | USGS Current Conditions | 15m | 1 | 37 |
| OTHER | WECC_STATS | WECC Interconnection Daily Status | daily | 6 | 30 |
Reference
Coverage breakdown
Top markets by stream count
| CAISO (California) | 80,965 |
| PJM Interconnection | 53,585 |
| ERCOT (Texas) | 48,816 |
| SPP (Southwest Power Pool) | 18,594 |
| IESO (Ontario) | 10,776 |
| EIA (US Federal) | 10,593 |
| MISO (Midcontinent) | 10,400 |
| ISO-NE (New England) | 7,586 |
| Mexico (CENACE) | 6,741 |
| NYISO (New York) | 4,993 |
| EPA Emissions | 3,486 |
| DNV GL Weather | 2,667 |
Data categories
| ISO / RTO operations | 242,653 |
| Government & regulator | 13,283 |
| Weather observations & forecasts | 5,567 |
| Power & fuel forecasts | 5,519 |
| Hydrology & reservoirs | 2,252 |
| Curated derived series | 1,618 |
| Control-area operations | 1,298 |
| Commodity exchanges | 1,010 |
| Natural gas operations | 133 |
| FX rates | 37 |
| Market surveys | 1 |
Reference
Update frequency
Cadence is set by the upstream market. The full spectrum from 1-minute dispatch through weekly reporting is exposed without stitching.
| Cadence | Active streams | Examples |
|---|---|---|
| 1-minute | 414 | AESO CSD, CAISO dispatch, AIL forecasts |
| 5-minute | 83,336 | RTM across CAISO, ERCOT, PJM, MISO, SPP, NYISO |
| 15-minute | 42,449 | RT 15-min markets, quarterly-hour settlements |
| 30-minute | 14 | Selected reliability and capacity series |
| Hourly | 129,761 | Day-ahead markets, AESO hourly pool price, forecasts |
| Daily | 5,997 | Settlements, metered volumes, daily indices |
| Weekly | 11,523 | Ancillary contracts, regulatory, standby reserves |
History depth notes
- AESO Alberta pool-price series reach back to 2001 and earlier.
- AESO 7/30-day rolling statistics hold more than 25 years of daily history.
- ERCOT, PJM, CAISO and NYISO operational series go back as far as each ISO has published.
- EIA hourly balancing-authority data backfilled to first publication.
- Weather archives from WSI, Vaisala and DNV GL support multi-year backtesting.
Reference
Coverage by market
Per-source detail: stream counts, earliest data, Snowflake view coverage, and what's included.
CAISO
- API active
- 80,965
- All-time
- 112,836
- Earliest data
- Apr 1998
- Snowflake
- 82 views
- ·Day-ahead and real-time LMPs at every PNode across the CAISO footprint
- ·HASP, RTPD, RTD and RTM prices, with congestion and loss components
- ·System load, area load and CAISO demand forecasts
- ·Ancillary service prices (regulation up/down, spin, non-spin)
- ·Generation outages, transmission outages, interties
Access
DataHub is available to Arcobi customers through REST API, Snowflake Secure Data Share, and Push-to-Cloud delivery. Talk to the team to scope access for your stack.